Maintain Bill of Materials (CB11)

Previous Top Next

Maintain Bill of Materials (CB11)
 
Function
Create and Maintain the Bill of Materials (BOM). Bill of Materials is created for an Assembly / Group.
 
 
How To Use
The BOM maintenance is carried out in 3 Stages
 
1. Assembly/Group Maintenance
 
2. Maintain Bill of Material for an Assembly
 
3. Specify Products for an Assembly
 
 
Filter
CAPTION
graphic
graphic
 
 
 
Buttons
Explain each button separately(Copy the template to Word and based on the no: of btns create the rows and paste it back)
 
 
Pre-requisites
If any
 
 
Notes