Enter a BOM

Previous Top Next

Enter a Bill Of Materials
 
The Bill of Materials can be Entered Manually or Loading from MS-Excel.
 
1. Register Parts using the facility BM11 or BM1X (to Load from MS-Excel) .
2. Using the facility CB11enter the Bill of Materials.
 
 
1. Enter the Group (also called Assembly/Sub- Assembly)
2. For the Group Enter the Components One by One .
3. After Entering all the Components check the Tree for the Usage of the
 
 
The facility offers the following actions to manipulate the Bill Of materials

 


M:\CES_8_Documentation\03_Engineering\BOM\cb11_04_bom_tree_example.png